Papers

The long version, with the page count.

The summary stays on the page. The PDF is the paper, and it downloads directly. There is no address field in front of the file.

Cover of white paper no. 1, November 2026. Title: Why good work goes unbuilt. Black field, a thin white curve, and a short blue arc labeled The gap. Actual size.
01November 2026

Why good work goes unbuilt

The most expensive projects are the ones that never happened. On paper, they cost nothing. About 70% of manufacturers were stuck in “pilot purgatory” (McKinsey, 2018), and 91.5% of big projects run over budget, over schedule, or both (Flyvbjerg). White paper #1: write the test before you build, then let the evidence decide. Proof over promises.

10 pages · US Letter

Read the summaryDownload PDF